Everyone is searching.: PCB Equipment 、 IC Substrate Equipment 、 JSW Vacuum Laminator 、 Vacuum Leveling Machine

The monthly work report sharing meeting for the grant of funds was held as scheduled, and department heads reported on the work achievements and problems encountered this month.
Due to the lack of timely filing and labeling of incoming and outgoing goods in the warehouse, there has been a phenomenon of accumulation and waste of goods. In the future, efforts will be made to classify and store goods in a timely manner to ensure the normal production needs of the workshop and strict control of product outbound.

The designers in the R&D department share, absorb, and learn from their experiences
At the meeting, in-depth analysis and discussion were conducted on the problems existing in the optimization and upgrading of pre bonding machines, PP drilling machines, and long arm thickness measuring instruments, and collective wisdom was gathered.

Mr. Shi gave instructions and suggestions on the problems existing in each department one by one, and affirmed the work achievements of each department.